首页> 外文会议>ASCE International Pipelines Conference >Developing Predictable Cost Curves for Urban Transmission Projects
【24h】

Developing Predictable Cost Curves for Urban Transmission Projects

机译:开发可预测的城市传输项目成本曲线

获取原文

摘要

Predictability is the key to any planning effort. Municipalities are often persuaded to keep rates low, and their cash inflow cannot keep up with the rising costs. However, at a time when construction costs are rising much higher than the rate of inflation, such predictability is often illusive. Adding to the lack of certainty, urban infrastructure projects are constantly faced with unique project characteristics that make predictability in costs far from the norm. With such issues facing the engineering and construction industry, presented below is one critical analysis performed for estimating the cost of the construction of water mains and the fascinating findings.
机译:可预测性是任何规划努力的关键。市政当局经常被说服以保持低利率,而现金流入不能跟上成本上涨。然而,当建筑成本上升的时间升高超过通胀率时,这种可预测性通常是虚幻的。增加了缺乏确定性,城市基础设施项目不断面临独特的项目特征,使得可预测性远离常态。在下面提供的工程和建筑业面临的这些问题是估计水管建设和迷人调查结果的成本进行了一个关键分析。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号