INNOVATIVE STRATEGIES FOR TEACHING CONSTRUCTION FUNDAMENTALS: IMPLEMENTING DESIGN-BUILD PROJECT DELIVERY PROCEDURES INTO A COURSE IN COST ESTIMATING

机译:教学施工基本面的创新策略:将设计建立项目交付程序实施到成本估算的课程中

获取原文

摘要

This paper describes the integration of design-build projects during the Fall Semester, 2006, into a cost estimating course in the Department of Engineering Technology at the University of North Carolina at Charlotte. Design-build is a project delivery system with an enviable record of bringing capital facilities on-line rapidly often with reduced overall project costs. Nevertheless, the procedure tends to be associated with higher risk as it radically short-cuts the traditional design-bid-build protocol where the contractor routinely receives an essentially completed design package prior to the development of a detailed estimate. Tradition methods allow a deliberate, independent development of work package quantities, durations, crew development, and assignment of costs. This paper examines the creation of a block of instruction in a conventional cost estimating course that addresses the salient characteristics of the alternative design-build project delivery particularly as it impacts the creation of project cost estimate including: The collaborative relationship between owners, designers, and constructors from initial project development through construction. The use of a general scope of work in the absence of completed designs to support creation of a conceptual estimate that determines total project costs based on: Features that can be readily priced with confidence; Alternatives for features that have yet to be adequately defined.
机译:本文介绍了设计建造一体化项目秋季学期,2006年期间,到工程技术的北卡罗莱纳大学部课程估算成本。设计 - 建设是一个项目交付系统,带来资金设施上线往往迅速降低项目总成本的一个令人羡慕的纪录。然而,该过程的倾向,因为它根本短切其中承包商常规的详细估计的显影之前接收到一个基本上完成设计包传统设计的投标建造协议以与高风险相关联。传统方法允许工作包的数量,持续时间,船员开发和成本分配的故意,自主开发。本文探讨在常规的成本当然估计所述创建指令的块的那个地址的替代设计,构建项目递送特别是因为它影响了创建项目成本估算的,包括的显着特点:业主,设计者之间的协作关系,并且通过从最初的建设项目开发建设者。在没有完成设计的一个概念上的估计,其基于项目总成本的支持创建使用工作的总体范围:可以很容易地定价有信心特点;对于还没有替代品的功能得到充分的定义。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号