首页> 外国专利> Method and computer program for estimating project costs and time factors and facilitating management of remodeling and construction projects

Method and computer program for estimating project costs and time factors and facilitating management of remodeling and construction projects

机译:估算项目成本和时间因素并促进改建和建设项目管理的方法和计算机程序

摘要

A method and computer program for estimating project costs and time factors and facilitating project management, wherein the project concerns remodeling or construction or a similar endeavor, and the management thereof involves estimating material and labor costs for each phase of the project; contract generation incorporating the estimate, special terms or conditions, and standard contract language; and procurement of materials and services, including subcontractor services, and scheduling of deliveries and labor, including hourly workers. The computer program comprises a number of cross-platform, fully-integrated subprograms and databases, including an Estimator Subprogram; a Materials Database; a Contract Subprogram; a Production Subprogram; a Worker Database; a Subcontractor Database; and a Vendor Database. Each subprogram is operable to, as needed import and incorporate data entered into or generated by the other subprograms and databases.
机译:一种用于估计项目成本和时间因素并促进项目管理的方法和计算机程序,其中该项目涉及改建或建造或类似的工作,并且其管理涉及估计该项目的每个阶段的材料和人工成本;包含估算,特殊条款或条件以及标准合同语言的合同生成;材料和服务的采购,包括分包商服务,以及调度和人工安排,包括小时工。该计算机程序包括许多跨平台的,完全集成的子程序和数据库,其中包括一个Estimator子程序;材料数据库;合同子程序;生产子程序;工人数据库;分包商数据库;和供应商数据库。每个子程序可根据需要进行操作,以导入和合并输入到其他子程序和数据库中或由其他子程序和数据库生成的数据。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号