Key Project Factors of Construction Time and Cost Performance during Incentive/Disincentive Highway Projects

机译:激励/抑制性高速公路项目施工时间和成本绩效的关键项目因素

获取原文

摘要

The Federal Highway Administration has encouraged the State Transportation Agencies to implementIncentive/Disincentive (I/D) contracting designed to minimize the disruption of traffic flow in highway construction projects.However, there is little understanding about project factors that affect the project time and cost performance of highway constructionprojects under I/D provisions. This paper presents key project factors that affect project time or cost performance during I/D highwayconstruction projects. First, this research was performed by collecting transportation construction project data from the FloridaDepartment of Transportation and evaluating the data using time and cost performance indices. Then, statistical analyses wereperformed to identify any differences in project performance among project variables. Finally, significant factors that influence projectperformance were identified and summarized.
机译:联邦公路管理局(Federal Highway Administration)鼓励各州运输机构实施 激励/抑制性(I / D)合同旨在最大程度地减少公路建设项目中的交通流干扰。 但是,对于影响公路建设项目时间和成本绩效的项目因素知之甚少 I / D规定下的项目。本文介绍了影响I / D公路期间项目时间或成本绩效的关键项目因素 建设项目。首先,这项研究是通过收集佛罗里达州的交通建设项目数据进行的 运输部并使用时间和成本绩效指标评估数据。然后,进行统计分析 执行以识别项目变量之间项目绩效的任何差异。最后,影响项目的重要因素 性能进行了识别和总结。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号