首页> 外文期刊>建筑环境与结构工程研究(英文) >Assessing the Impact of the Lead/Lag Times on the Project Duration Estimates in Highway Construction
【24h】

Assessing the Impact of the Lead/Lag Times on the Project Duration Estimates in Highway Construction

机译:Assessing the Impact of the Lead/Lag Times on the Project Duration Estimates in Highway Construction

获取原文
获取原文并翻译 | 示例
       

摘要

The literature mentions multiple factors that can affect the accuracy of estimating the project duration in highway construction,such as weather,location,and soil conditions.However,there are other factors that have not been explored,yet they can have significant impact on the accuracy of the project time estimate.Recently,TxDOT raised a concern regarding the importance of the proper estimating of the lead/lag times in project schedules.These lead/lag times are often determined based on the engineer’s experience.However,inaccurate estimates of the lead/lag time can result in unrealistic project durations.In order to investigate this claim,the study utilizes four time sensitivity measures(TSM),namely the Criticality Index(CI),Significance Index(SI),Cruciality Index(CRI),and the Schedule Sensitivity Index(SSI)to statistically analyze and draw conclusions regarding the impact of the lead/lag time estimates on the total duration in highway projects.An Excel-based scheduling software was developed with Monte Carlo simulation capabilities to calculate these TSM.The results from this paper show that the variability of some lead/lag times can significantly impact the accuracy of the estimated total project duration.It was concluded that the current practices used for estimating the lead/lag times are insufficient.As such,it is recommended to utilize more robust methods,such as the time sensitivity measures,to accurately estimate the lead/lad times in the projects scheduled.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号