Direct Current (DC) transmission is an important part of modern power transmission system. In recent years, large numbers of DC project are under construction. The construction changes in DC projects have become a common issue. Based on the construction changes of the Three Gorges - Guangdong and the Three Gorges - Shanghai DC transmission line construction projects, this paper designs a questionnaire and conducts a questionnaire survey to management and technical staff of project owners, design firms, supervision firms and contractors. The outcome about the importance of changes factors is collected and the main factors impacting transmission line construction changes to its duration and cost are identified. Using agreement analysis method, the agreement degree of the factors impacting on the construction schedule and costs are found. The result may help to control and manage construction changes in transmission line projects.
机译:直流(DC)传输是现代电力传输系统的重要组成部分。近年来,大量的DC项目正在建设中。直流项目的施工变化已成为一个常见问题。基于三峡峡谷和三峡峡谷 - 上海直流输电线建设项目的建设变迁,本文设计了调查问卷,并对项目业主,设计公司,监督公司和承包商的管理和技术人员进行问卷调查。收集了关于变化因子重要性的结果,并确定了影响传输线施工的主要因素对其持续时间和成本进行了变化。使用协议分析方法,发现了影响施工进度和成本的因素的协议程度。结果可能有助于控制和管理传输线路项目的施工变化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号