Hard Rock Tunnel Rehabilitation: Small Demonstration Project Informs Design of Complete Tunnel Rehabilitation Project

机译:硬岩隧道康复:小型示范项目通知完整的隧道康复项目设计

获取原文

摘要

San Francisco Public Utility Commission is currently designing an extensive $143 million rehabilitation and repair project for the Mountain Tunnel, scheduled to begin construction in 2020. A $5.9 million interim repair contract was undertaken in 2018/2019 to perform portions of work and provide a demonstration of the project elements. The interim repairs, performed during a 60-day shutdown, included repairs to defective sections of tunnel liner, contact grouting, and invert paving. This paper discusses lessons learned from the design and construction of the interim repairs contract and how these elements will be implemented in the larger Mountain Tunnel Improvements Project.
机译:旧金山公用事业委员会目前正在为2020年开始建设的山隧道进行广泛的1.43亿美元康复和维修项目。2018/2019年,在2011年进行了590万美元的临时维修合同,以执行工作部分并提供示范 项目元素。 在60天停机期间进行的临时修理,包括修复隧道衬里的缺陷部分,接触灌浆和反转铺路。 本文讨论了从临时维修合同的设计和建设中了解的经验教训以及如何在较大的山隧道改进项目中实施这些要素。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号