首页> 外文会议>Power-Gen International Conference >Case Study - Alternatives for Compliance with ELG Rule at Midwest Utility
【24h】

Case Study - Alternatives for Compliance with ELG Rule at Midwest Utility

机译:案例研究 - 在中西部效用遵守ELG规则的替代方案

获取原文

摘要

This paper will present the various FGD wastewater treatment alternatives considered for compliance with the ELG rule at a large Midwest utility. FGD wastewater treatment alternatives evaluated included physical / chemical / biological treatment, air preheater bypass evaporator, iron adsorption, gas fired spray dryer, thermal evaporation, evaporation ponds, and SBS injection. The paper will discuss the advantages and disadvantages of each alternative. Capital and operating cost data will be provided along with implementation schedules. Burns & McDonnell was hired to conduct an evaluation of technical alternatives of FGD wastewater treatment for compliance with the ELG rule at a medium sized, coal fired, utility plant. This paper documents the various technologies that were considered as part of that study.
机译:本文将介绍各种FGD废水处理替代品,考虑符合大型中西部效用的ELG规则。 FGD废水处理替代品评价物理/化学/生物处理,空气预热器旁路蒸发器,铁吸附,燃气喷雾干燥机,热蒸发,蒸发池和SBS注射。本文将讨论各种替代方案的优缺点。将提供资本和运营成本数据以及实施计划。燃烧和麦克唐纳被聘请进行FGD废水处理技术替代品,以遵守中等大小的煤炭,型电厂植物的ELG规则。本文介绍了作为该研究的一部分被认为的各种技术。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号