首页> 外文会议>Conference on Nondestructive Evaluation of Aging Bridges and Highways >Post-tensioning equipment for the City of Wichita Flyover Project
【24h】

Post-tensioning equipment for the City of Wichita Flyover Project

机译:威奇托市城市的张紧设备

获取原文

摘要

Post tensioning work on the Kellogg Flyover Project included top deck and pier diaphragm transverse post tensioning cables. Also included were draped and negative moment area longitudinal post tensioning cables. My observations during inspecting this work raised questions in my mind regarding possible improvements in the operation which would be possible if enhancements in equipment and/or materials were available. In this paper, I will describe areas in which improved equipment and/or materials would have saved time and money in constructing the project. I will also briefly discuss where nondestructive testing might be helpful in assessing the long term performance of the structures post tensioning system.
机译:Kellogg Flyover项目的后张紧工作包括顶层甲板和码头隔膜横向柱张紧电缆。还包括悬垂和负片段纵向柱张紧电缆。在检查这项工作期间的观察结果在我的脑海中提出了关于可能的改进的问题,如果设备和/或材料的增强功能可以进行。在本文中,我将描述改进设备和/或材料将节省时间和金钱在构建项目时的领域。我还将简要讨论非破坏性测试在评估结构后张紧系统的长期性能方面有所帮助。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号