首页> 外国专利> MAINTENANCE METHOD FOR POWER NETWORK OF DISTRICT, TOWN, OR CITY; MAINTENANCE METHOD FOR POWER NETWORK DURING ERECTION OF DEVELOPMENT PROJECTS THEREOF; MAINTENANCE METHOD FOR POWER NETWORK DURING REPAIRS AND/OR RECONSTRUCTION OF BUILDING, STRUCTURE, COMPLEX OF BUILDINGS, INDUSTRIAL COMPLEX PROJECTS; AND METHOD FOR POWER NETWORK MAINTENANCE DURING RECONSTRUCTION AND/OR ERECTION OF TRANSPORT COMPLEX PROJECTS IN DISTRICT, TOWN, OR CITY

MAINTENANCE METHOD FOR POWER NETWORK OF DISTRICT, TOWN, OR CITY; MAINTENANCE METHOD FOR POWER NETWORK DURING ERECTION OF DEVELOPMENT PROJECTS THEREOF; MAINTENANCE METHOD FOR POWER NETWORK DURING REPAIRS AND/OR RECONSTRUCTION OF BUILDING, STRUCTURE, COMPLEX OF BUILDINGS, INDUSTRIAL COMPLEX PROJECTS; AND METHOD FOR POWER NETWORK MAINTENANCE DURING RECONSTRUCTION AND/OR ERECTION OF TRANSPORT COMPLEX PROJECTS IN DISTRICT, TOWN, OR CITY

机译:区域,城镇或城市电网的维护方法;开发项目架设过程中的电网维护方法;建筑物,结构,建筑物的复杂性,工业复杂性项目的维修和/或改造过程中的电网维护方法;区域,城镇或城市的运输复杂项目的重建和/或架设期间的电网维护的方法和方法

摘要

FIELD: electrical engineering; power supply to various projects. ; SUBSTANCE: proposed method includes partial reconstruction of existing power network and/or erection of new local power network by laying power cable lines between at least two independent power supplies located on geographically spaced apart areas and modular distribution center mounted on pre-erected foundation and made in the form of at least one transportable prefabricated module or three-dimensional heated unit accommodating two mutually redundant sections of switching and protective devices, lengths of external opposing pairs of unit walls being of definite proportions. Equipment is mounted at manufacturing plant or at least partially upon installation of three-dimensional unit on foundation; this unit is mounted for reuse by removal from foundation, displacement, and connection to power networks of other projects, including those newly erected or reconstructed in district, town, or city. Power network maintenance method during erection of development projects in district, town, or city includes at least partial reconstruction of existing power network by laying new power cable lines between newly erected development project and at least two independent geographically spaced apart power supplies mounted on pre-erected foundation of modular distribution center. Optimal design of three-dimensional units, optimal proportion of their parameters, and optimal arrangement of equipment in them, considering their functional applications, facilitate maintenance of these units. ; EFFECT: enhanced economic efficiency, reliability, and service life of power network. ; 20 cl, 15 dwg
机译:领域:电气工程;为各种项目供电。 ; 实体:所提出的方法包括通过在位于地理上隔开的区域的至少两个独立电源与安装在预先安装的模块式配电中心之间的至少两个独立电源之间铺设电缆线来部分重建现有电网和/或架设新的本地电网以至少一个可运输的预制模块或三维加热单元的形式制成,可容纳开关和保护装置的两个相互冗余的部分,外部相对的单元壁对的长度具有确定的比例。设备安装在制造工厂或至少部分安装在基础上的三维单元上;通过从基础,位移以及与其他项目(包括在地区,城镇或城市中新建立或重建的项目)的电网的连接中移除,该单元可以重新使用。在地区,城镇或城市的开发项目安装过程中的电网维护方法包括:通过在新近建成的开发项目与至少两个独立的地理上隔开的独立电源之间放置新的电缆线,对现有电网进行至少部分的重建。搭建模块化配送中心的基础。考虑到它们的功能应用,三维单元的优化设计,参数的最佳比例以及设备的优化布置,都有助于维护这些单元。 ; 效果:提高电网的经济效率,可靠性和使用寿命。 ; 20 cl,15 dwg

著录项

  • 公开/公告号RU2240639C1

    专利类型

  • 公开/公告日2004-11-20

    原文格式PDF

  • 申请/专利权人

    申请/专利号RU20030112645

  • 发明设计人

    申请日2003-04-30

  • 分类号H02B5/00;H02B7/06;

  • 国家 RU

  • 入库时间 2022-08-21 22:02:18

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号