首页> 外文会议>International Conference on Structural Failures >Floor defects in quarters over railway tunnel caused by design and construction errors
【24h】

Floor defects in quarters over railway tunnel caused by design and construction errors

机译:由设计和施工错误引起的铁路隧道宿舍楼层缺陷

获取原文

摘要

The main subject of this paper is a floor in the quarters located above the railway tunnel in the large-area Shopping Center. The considered floor did not meet the satisfactory safety conditions, as a result of design and construction errors, which were a direct cause of the failure. In the long term, failure could lead to a construction disaster.
机译:本文的主要主题是位于大区域购物中心的铁路隧道之上的宿舍的地板。由于设计和施工误差,所考虑的地板没有满足令人满意的安全条件,这是失败的直接原因。从长远来看,失败可能导致建筑灾难。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号