首页>
外国专利>
TUNNEL CONSTRUCTION METHOD BY ABNORMAL WIND PRESSURE DISSOLVING BUFFER METHOD ADAPTED TO SUPERHIGH-SPEED RAILWAY AGE AND BY PERMANENT REMAINING METHOD OF CONCRETE FORM BASED ON NEWLY DEVELOPED DESIGN
TUNNEL CONSTRUCTION METHOD BY ABNORMAL WIND PRESSURE DISSOLVING BUFFER METHOD ADAPTED TO SUPERHIGH-SPEED RAILWAY AGE AND BY PERMANENT REMAINING METHOD OF CONCRETE FORM BASED ON NEWLY DEVELOPED DESIGN
展开▼
机译:适应超高速铁路时代的异常风压溶解缓冲法和基于新设计的混凝土模板永久保留法的隧道施工方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To eliminate intensive rolling caused by abnormal wind pressure generated when a high-speed train enters a tunnel.;SOLUTION: A tunnel entrance is formed in a curved surface wall body structure shape similar to a daffodil, and a form using a flexible material (such as a synthetic rubber material) is used as a permanent form (a form not removed after concrete placing) for construction.;COPYRIGHT: (C)2005,JPO&NCIPI
展开▼