The Finnish Parliament ratified in May 2002 the application for a Decision-in- Principle (DIP) that was submitted by Teollisuuden Voima Oy (TVO) in November 2000 concerning the construction of a new nuclear power plant in Finland (FIN5). The bid inquiries for FIN5 were sent out by TVO in September 2002, requesting the bids by the end of March 2003. A contract with the plant supplier was signed in December 2003, implying the construction of a PWR of type EPR (European Pressurised Water Reactor) in Olkiluoto, called Olkiluoto 3 NPP. The preparation of Bid Inquiry Specifications (BIS) was initiated simultaneously with the filing of the application for DIP. The compilation of BIS was an evolutionary process, starting with the collection of relevant reference material, proceeding through the development of technical, administrative and commercial requirements, and ending with the consolidation of all documentation to a package containing the complete BIS. An intensive bid evaluation process started immediately after receiving the bids, accompanied by negotiations with the supplier candidates. The final Contract Specifications (CS) were constituted on the basis of the BIS supplemented with information contained in the bid and the outcome of the contract negotiations.
机译:芬兰议会批准了2002年5月为2000年11月提交的Teollisuuden Voima Oy公司(TVO)关于芬兰(FIN5)的新核电厂的建设决策IN-原则(DIP)中的应用。对于FIN5投标查询由该TVO在2002年9月发出的,要求通过的2003年3月合约最终出价与工厂的供应商于2003年12月签署,这意味着类型EPR的PWR(欧洲压水堆的建设)在Olkiluoto,称为Olkiluoto 3 NPP。在备案申请浸渍时,同时启动投标查询规范(BIS)的准备。 BIS的汇编是一种进化过程,从相关参考资料的收集开始,通过制定技术,行政和商业要求,并结束所有文件到包含完整BIS的包裹的整合。收到出价后立即启动强化投标评估过程,伴随着与供应商候选人的谈判。最终合同规范(CS)是根据BIS构建的,该等BIS由竞标中包含的信息及合同谈判的结果为基础。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号