首页> 外文会议>International Conference on Production Research >ANALYSIS OF WAITING TIME OF DEMAND REQUIRING MULTIPLE ITEMS UNDER A BASE STOCK POLICY
【24h】

ANALYSIS OF WAITING TIME OF DEMAND REQUIRING MULTIPLE ITEMS UNDER A BASE STOCK POLICY

机译:在基础股票政策下需要多个项目的需求等待时间分析

获取原文

摘要

In demanding for repair items or standard products, customers sometimes require multiple common items. In this study the waiting time of demand which require multiple items under base stock policy is analyzed theoretically and numerically. It is assumed that the production time has an exponential distribution and the demand is satisfied under a FCFS rule. Each demand waits until all of its requirements are satisfied. An arriving process of demand is assumed to follow a Poisson process and the numbers of required items are independent and generally distributed. A method for deriving waiting time distribution of demand is shown by using known methods for computing MX/M/1 waiting time distribution and for deriving the distribution on the order corresponding to the last item the current customer requires. By using the analytical results, properties of waiting time distribution of demand and optimal numbers of base stocks are discussed through numerical experiments.
机译:在要求维修项目或标准产品时,客户有时需要多个常见物品。在这项研究中,理论上和数值分析了基础股票政策下需要多个项目的需求等待时间。假设生产时间具有指数分布,并且在FCF规则下满足需求。每种需求等待,直到满足其所有要求。假设需要遵循泊松过程的到达过程,并且所需物品的数量是独立的并且通常分布。通过使用用于计算MX / M / 1等待时间分布的已知方法以及用于导出与当前客户所需的最后一项对应的顺序的分布来导出需求等待时间分布的方法。通过使用分析结果,通过数值实验讨论了需求和最佳数量的等待时间分布的特性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号