首页> 外文期刊>Journal of Service Science and Management >Waiting Time Distribution of Demand Requiring Multiple Items under a Base Stock Policy
【24h】

Waiting Time Distribution of Demand Requiring Multiple Items under a Base Stock Policy

机译:基本库存策略下需要多个物料的需求的等待时间分布

获取原文
       

摘要

In demanding for repair items or standard products, customers sometimes require multiple common items. In this study, the waiting time of demand which requires multiple items under base stock policy is analyzed theoretically and numerically. It is assumed that the production time has an exponential distribution and the demand is satisfied under a FCFS rule. Each demand waits until all of its requirements are satisfied. An arriving process of demand is assumed to follow a Poisson process and the numbers of required items are independent and generally distributed. A method for deriving waiting time distribution of demand is shown by using methods for computing MX/M/1 waiting time distribution and for deriving the distribution on the order corresponding to the last item the current customer requires. By using the analytical results, properties of waiting time distribution of demand and optimal numbers of base stocks are discussed through numerical experiments.
机译:在要求维修项目或标准产品时,客户有时需要多个通用项目。在本研究中,从理论和数值上分析了基本库存政策下需要多个项目的需求等待时间。假定生产时间具有指数分布,并且在FCFS规则下满足需求。每个需求都等到满足所有需求。假定需求的到达过程遵循泊松过程,并且所需物料的数量是独立的且通常是分布的。通过使用用于计算MX / M / 1等待时间分布并用于推导对应于当前客户所需的最后一项的订单的分布的方法,示出了推导需求的等待时间分布的方法。利用分析结果,通过数值实验讨论了需求的等待时间分布和基本库存的最佳数量的性质。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号