首页> 外文会议>International Conference on Shotcrete for Underground Support >STRUCTURAL RETROFITTING OF RESCUE TUNNELS IN SINGLE SHELL SHOTCRETE CONSTRUCTION - REQUIREMENTS AND EXPERIENCES
【24h】

STRUCTURAL RETROFITTING OF RESCUE TUNNELS IN SINGLE SHELL SHOTCRETE CONSTRUCTION - REQUIREMENTS AND EXPERIENCES

机译:单壳喷射施工中救援隧道的结构改装 - 要求和经验

获取原文

摘要

As a result of the devastating fire events in the transalpine tunnels at the turn of the millennium, the EU Tunnel Directive (2004/54/EC) was developed. The Directive provides that the distances between the emergency exits shall not be more than 300 m. The national implementation of the Directive in Germany was the Guidelines for the Equipment and Operation of Road Tunnels (RABT) 2006. The stipulations in the RABT created the re-equipment needs of the - at that time - round about 200 existing federal road tunnels. To ensure the lower emergency exit distances several cross passages, rescue shafts and - since about 50% of the existing tunnels are operated bi-directionally - rescue tunnels had to be build.
机译:由于Transalpine隧道在千年轮隧道中的毁灭性发生事件,开发了欧盟隧道指令(2004/54 / EC)。该指令规定,紧急出口之间的距离不得超过300米。德国指令的国家实施是Road Tunnels(RABT)2006的设备和运营指导方针。rabt的规定创造了当时的重新装备需求 - 关于200个现有联邦道路隧道。为了确保较低的紧急出口距离几个交叉通道,救援轴和 - 由于大约50%的现有隧道是双向 - 救援隧道必须构建的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号