首页> 外文会议>International Symposium on Automation and Robotics in Construction >A Structured Approach to Form Dependency Structure Matrix for Construction Projects
【24h】

A Structured Approach to Form Dependency Structure Matrix for Construction Projects

机译:形成依赖结构矩阵的结构化方法

获取原文

摘要

The sequence of design activities is vital, particularly in interdisciplinary projects. Sequencing of activities is influenced by the information dependency among the activities. The dependency relationships among the design activities in a project are of three types - independent, dependent and interdependent or loops. Interdependent activities (or loops) require assumed information to start and progress. If these assumptions are erroneous, it can lead to rework of a single or a group of dependent activities. One of the challenges in planning the sequencing of design activities is to decide on appropriate information or assumptions which can be made to break the interdependent activities (or loops). Conventional tools such as Critical Path Method (CPM) and Program Evaluation and Review Technique (PERT) are not suitable for representing information flow because interdependent activities or loops cannot be modeled. Dependency Structure Matrix (DSM) has been identified as a potential tool to model feedback loops/cycles. One of the main difficulties in implementing DSM is in comprehensively identifying the activities and information dependencies which are required to formulate the DSM. Based on the experience in attempting to develop a DSM for an interdisciplinary project, the authors have proposed a new approach in identifying all the possible activities and their information dependencies. A prototype software also had been developed in Excel VBA for implementing the methodology. The proposed concepts are illustrated through application to Induced Draft Cooling Tower (IDCT) projects. This illustration is multidisciplinary in nature consisting of mechanical, civil, electrical and instrumentation. The proposed concept has proven fruitful and hence this approach is anticipated beneficial for construction applications.
机译:设计活动序列至关重要,特别是在跨学科项目中。活动排序受活动之间信息依赖的影响。项目中的设计活动之间的依赖关系是三种类型的 - 独立,依赖性和相互依存的或循环。相互依存的活动(或循环)需要假设的信息来开始和进度。如果这些假设是错误的,它可能导致单一或一组依赖活动的重写。规划设计活动排序的挑战之一是决定可以制作适当的信息或假设,以打破相互依存的活动(或循环)。诸如关键路径方法(CPM)和节目评估和审查技术(PERT)的传统工具不适合代表信息流,因为不能建模相互依存的活动或环路。依赖结构矩阵(DSM)已被识别为模拟反馈回路/周期的潜在工具。实施DSM的主要困难之一是全面地识别制定DSM所需的活动和信息依赖性。根据试图开发跨学科项目的DSM的经验,作者提出了一种新的方法来确定所有可能的活动及其信息依赖性。还在Excel VBA中开发了原型软件,用于实施方法。所提出的概念通过应用于诱导的冷却塔(IDCT)项目来说明。本例证是由机械,民用,电气和仪器组成的多学科。拟议的概念已被证明是富有成效的,因此预计这种方法对施工应用有益。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号