Epitomising the structure of a project network for crashing by identifying non-requisite activities

机译:通过识别非必要活动来缩影项目网络的结构崩溃

获取原文

摘要

The complexity of project network depends on two factors. One on number of activities and second on precedence relationship. Project time is keynote in project analysis. Project can be crashed where there exists the normal and crash time-cost tradeoff of activities. Excluding non-critical activities, as they cannot influence project duration, the structure of the network is reduced in magnitude. Smaller and simpler structure of network is helpful in optimizing many problems in project analysis. A method to identify the non-requisite activities is proposed here to reduce the structure of project network.
机译:项目网络的复杂性取决于两个因素。一对一的活动和第二个优先关系。项目时间是项目分析中的主题。项目可以在存在正常和崩溃的时间成本权衡的地方崩溃。不包括非关键活动,因为它们无法影响项目持续时间,幅度的结构幅度降低。较小和更简单的网络结构有助于优化项目分析中的许多问题。提出了一种识别非必要活动的方法,以减少项目网络的结构。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号