A structured key cost analysis methodology to identify value-contributing activities in mining projects: a case study of the Chuquicamata Underground Project

机译:结构化关键成本分析方法,以确定采矿项目中的价值贡献活动:Chuquicamata地下项目的案例研究

获取原文
获取原文并翻译 | 示例
       

摘要

Traditional project evaluation methods for estimating operating costs of mining projects mostly produce static and over-conservative evaluations. In this study, a systematic model for managing the economic risk of the operating costs for an ongoing 'supercave' project, the Chuquicamata Underground Project, is presented. Key cost generators are identified, and their inherent variability is characterized based on a similar underground operation and expert judgment. Using Monte Carlo simulations, variability is factored into the evaluation, and the economic risk associated with each variable is quantified, after which the simulated data is used to identify the underlying risk, as well as mitigating actions and opportunities. The methodology can serve to identify how variability may impact the value of the project and how mitigation actions could decrease the present value of the estimated operating cost of the project by more than 10%. As a result of the analysis, the project managers became aware that labour and energy costs are the major contributors from a risk-value perspective, and mitigating actions such as construction of a power plant and implementation of a well-designed labour productivity incentive plan could be justified with a reduction of the overall risk value of the project
机译:用于估算矿业项目运营成本的传统项目评估方法主要产生静态和过保守的评估。在这项研究中,提出了一种用于管理正在进行的“超级扫描”项目的经营成本的经济风险的系统模型,Chuquicamata地下项目。识别关键成本发电机,其固有的变异性是基于类似地下操作和专家判断的特征。使用Monte Carlo模拟,因其分化为评估,并且量化与每个变量相关的经济风险,之后模拟数据用于识别潜在风险,以及减轻行动和机会。方法可以用于确定可变性如何影响项目的价值以及减缓行动如何将估计运营成本的现值降低超过10%。由于分析,项目经理人意识到劳动力和能源成本是来自风险价值视角的主要贡献者,以及减轻电厂建设等减轻行动,以及实施精心设计的劳动生产力激励计划以减少项目的总体风险价值而合理

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号