首页> 外文会议>International conference on probabilistic safety assessment and management >Extension of the South Texas Project PRA to Secondary Plant Equipment
【24h】

Extension of the South Texas Project PRA to Secondary Plant Equipment

机译:南德克萨斯州项目PRA延伸到二级工厂设备

获取原文

摘要

The purpose of this paper is to present work being performed to integrate key secondary plant systems into the South Texas Project (STP) Probabilistic Risk Assessment (PRA). By considering secondary, or "Balance-Of-Plant" (BOP) equipment, the time dependent variation of plant risk can be evaluated in a more rigorous manner by considering the impact of this equipment on initiating event frequency. In addition, since BOP systems dominate plant performance characteristics such as plant availability and capacity factors, consideration of monetary risk (in addition to safety risk) is consistent with the philosophy of comprehensive risk management in place at STP.
机译:本文的目的是展示正在进行的工作,以将关键二级工厂系统集成到南德克萨斯州项目(STP)概率风险评估(PRA)中。通过考虑二次或“植物平衡”(BOP)设备,可以通过考虑该设备对启动事件频率的影响,以更严格的方式评估植物风险的时间依赖性变化。此外,由于BOP系统支配了植物性能特征,例如工厂的可用性和容量因素,因此考虑货币风险(除安全风险之外)与STP的综合风险管理哲学一致。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号