West Palm Beach 48-Inch Pipeline Rehabilitation

机译:西棕榈滩48英寸管道修复

获取原文

摘要

The City of West Palm Beach, Florida recently embarked on one of the largest projects of its kind to rehabilitate a 40+ year old PCCP force main using a fiber-reinforced cured-in-place method. A condition assessment concluded that a significant number of pipe segments had broken wire wraps, ranging from 5 to 100 broken wires per 20-foot segment, providing a significant risk of failure. Since there are no other lines that carry the city’s flow, the City made the decision to be proactive and repair the pipe before a catastrophic failure could occur.The 48-inch diameter pipeline, running more than a mile at 5,700 lineal feet, required an alternative solution as rerouting the flow was not possible. A fiber-reinforced CIPP product from Insituform was selected to strengthen and rehabilitate the line. Completed in October 2016, the jobsite presented numerous challenges, including a significant portion of the job location running through a private country club near and million dollar homes, near a canal, and across a private condominium complex with extremely tight access. As stated above, the line was responsible for carrying 100 percent of the City of West Palm Beach’s sanitary sewer flows, so shut down was not an option. During installation, the country club’s golf course also had to be kept open.
机译:佛罗里达州西棕榈滩市最近着手进行此类最大的项目之一,以采用纤维增强的现场固化方法修复40多年历史的PCCP部队主管。条件评估得出的结论是,许多管段的金属丝缠绕断裂,每20英尺段5至100根金属丝断裂,存在很大的故障风险。由于没有其他线路可以承载城市的水流,因此纽约市决定采取主动行动,并在发生灾难性故障之前进行维修。 直径为48英寸的管道在5700英尺的直线英尺上运行了超过一英里,需要一种替代解决方案,因为无法重新路由流量。选择了Insituform的纤维增强CIPP产品来增强和修复生产线。该工作地点于2016年10月完工,带来了许多挑战,其中很大一部分工作地点是通过附近的私人乡村俱乐部和百万美元的房屋,运河附近以及穿过极为狭窄通道的私人公寓大楼进行的。如上所述,该生产线负责运送西棕榈滩市100%的下水道污水,因此不可以选择关闭。在安装过程中,乡村俱乐部的高尔夫球场也必须保持开放。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号