首页> 外文期刊>Transportation Research Record >Hybrid Bridge Strengthening: Structural Rehabilitation of Blue Heron Bridge, West Palm Beach, Florida
【24h】

Hybrid Bridge Strengthening: Structural Rehabilitation of Blue Heron Bridge, West Palm Beach, Florida

机译:混合桥加固:佛罗里达州西棕榈滩蓝鹭桥的结构修复

获取原文
获取原文并翻译 | 示例
           

摘要

The bridge located on Blue Heron Boulevard over I-95 in West Palm Beach, Florida, was damaged when a construction vehicle carrying a large crane violated the height clearance limitation. The collision caused extensive damage to two of the bridge girders (AASHTO Type Ⅱ), which led to the closure of one lane on I-95. Details of the structural rehabilitation of the bridge are presented. A strengthening scheme was devised for the bridge rehabilitation. The need to reopen the closed lane in a short period of time required a hybrid strengthening alternative, in which the first damaged girder was fully replaced with a new steel girder and the second girder was strengthened with composite laminates. A load-rating study showed that the strengthening scheme raised rating factors to acceptable levels for all Florida Department of Transportation standard trucks.
机译:佛罗里达州西棕榈滩I-95州蓝鹭林荫大道上的桥梁因载有大型起重机的工程车辆违反了高度限制而被损坏。碰撞对两座桥梁(AASHTOⅡ型)造成了广泛破坏,导致I-95上的一条车道关闭。介绍了桥梁的结构修复细节。为桥梁的修复设计了一个加固方案。需要在短时间内重新打开封闭车道需要一种混合加固的替代方案,其中第一个损坏的大梁完全由新的钢制大梁代替,而第二个大梁则由复合层压板加固。一项负荷评估研究表明,加固方案将所有佛罗里达运输部标准卡车的评级因子提高到可接受的水平。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号