The construction of the Boynton Beach Bascule Bridge presented many challenges to the owner, designer, and the construction team. The new bridge was constructed on the same alignment as the existing bridge so the first task was removing the existing Bascule Bridge. A 300-ton mobile crane was used to remove each leaf of the old rolling lift bridge in two pieces. Demolition of bascule piers is always a difficult task. The piers were founded on large footings, which were poured on the top of thick concrete seals. Both engineers and contractors often underestimate the time required for this phase. The Boynton Beach Bridge was no exception. Complete removal of the span, piers, and piling took approximately six months, three months longer than anticipated.
机译:博因顿海滩开启桥的建设给业主,设计师和施工团队带来了许多挑战。新桥的构造与现有桥的对齐方式相同,因此第一个任务是删除现有的Bascule桥。用一台300吨的移动式起重机将旧的滚动吊桥的每一片叶子拆成两部分。拆除墩墩始终是一项艰巨的任务。码头建立在大型基础上,然后将基础浇在厚厚的混凝土密封条上。工程师和承包商通常都低估了此阶段所需的时间。博因顿海滩大桥也不例外。完全拆除跨度,桥墩和打桩所需的时间大约为六个月,比预期的时间长了三个月。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号