首页> 外文会议>Annual conference of the Canadian Society for Civil Engineering >Construction Manager General Contractor, Innovative Delivery Model for a Bridge Project in Ontario
【24h】

Construction Manager General Contractor, Innovative Delivery Model for a Bridge Project in Ontario

机译:安大略省桥梁项目的创新交付模型施工经理总承包商

获取原文

摘要

The Construction Manager, General Contractor (CMGC) is a new alternative contract delivery model for the Ministry of Transportation Ontario (Ministry). The intent of CMGC is to form a collaborative team, between the owner, designer and a contractor, which begins in design and continues throughout construction. During design the contractor provides construction expertise and constructability input into the design with the intent to become the general contractor during construction. In 2011, MTO initiated its first CMGC project, the Cayuga Bridge replacement project. The Cayuga Bridge constructed in 1924 is a five span, 190 m long, steel through truss bridge is at the end of its' life. This Grand River crossing provides access to the community of Cayuga and carries gas and telephone utilities. With no alternative crossing nearby, closing the bridge to accommodate construction for two years is not a viable option. Adding to the complexity of the project, the Grand River provides habitat for many endangered aquatic species, and the west banks of the Grand River are identified to be a significant archaeological site with artifacts dating back to 8000 BC. Through the collaborative CMGC team approach, an innovative construction staging design was completed that minimized environmental and archaeological impacts while maintaining traffic and utility services throughout construction. This paper will include the rationale for selecting the CMGC model, an overview of how the model works and how the work has unfolded on the Cayuga Bridge project.
机译:总承包商的施工经理(CMGC)是安大略省交通运输部(部)的一种新的替代合同交付模式。 CMGC的目的是在业主,设计师和承包商之间形成一个协作团队,该团队从设计开始一直贯穿于整个施工过程。在设计过程中,承包商将在设计中提供施工专业知识和可施工性输入,以期在施工期间成为总承包商。 2011年,MTO启动了其第一个CMGC项目,即卡尤加桥更换项目。卡尤加桥(Cayuga Bridge)建于1924年,使用寿命为5跨,长190 m,钢制桁架桥。这座大河道可通往卡尤加(Cayuga)社区,并提供煤气和电话设施。由于附近没有其他人行横道,因此关闭桥梁以容纳两年的建筑不是一个可行的选择。大项目增加了项目的复杂性,大河为许多濒临灭绝的水生物种提供了栖息地,大河西岸被认为是重要的考古遗址,其文物可追溯到公元前8000年。通过CMGC团队的合作,完成了创新的施工分期设计,将环境和考古影响降至最低,同时在整个施工过程中保持交通和公用事业服务。本文将包括选择CMGC模型的原理,该模型的工作原理以及Cayuga桥项目如何开展工作的概述。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号