首页> 外文期刊>TR news >Construction Manager-General Contractor Project Delivery
【24h】

Construction Manager-General Contractor Project Delivery

机译:施工经理-总承包商项目交付

获取原文
获取原文并翻译 | 示例
           

摘要

On road, bridge, and other transportation projects, state departments of transportation (DOTs) across the country are adopting innovations in project delivery methods, procurement procedures, and payment provisions. The growing use of alternative project delivery and the need for rapid renewal of the nation's aging highway infrastructure call for supporting research. In June 2010, the Federal Highway Administration (FHWA) introduced the Every Day Counts (EDC) initiative to address this issue. The program is designed to accelerate the implementation of innovative practices.
机译:在公路,桥梁和其他运输项目上,全国各地的州交通运输部(DOT)正在采用项目交付方式,采购程序和付款规定方面的创新。替代项目交付的使用日益增加,以及国家老化的高速公路基础设施需要快速更新的需求,要求支持研究。 2010年6月,联邦公路管理局(FHWA)推出了“每天计数”(EDC)计划以解决此问题。该计划旨在加快创新实践的实施。

著录项

  • 来源
    《TR news》 |2013年第285期|10-14|共5页
  • 作者

    DOUGLAS D. GRANSBERG;

  • 作者单位

    Construction Engineering, Iowa State University, Ames;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号