Factors Militating Against Prompt Delivery of Construction Projects inudLagos Megacity, Nigeria: Contractors’ Perspective

机译:阻碍建设项目及时交付的因素尼日利亚拉各斯大城市:承包商的观点

摘要

Delay is a common issue faced in the construction industry all over the world especially in developing countries. The aim of thisudstudy is to evaluate factors causing delays and their effects on construction projects in Lagos Mega City, Nigeria from theudcontractors’ perspective. It is predicated on the incessant delay experienced by contractors on construction projects. Purposiveudsampling method was adopted for the study;. Quantitative data was obtained by administration of One hundred (100) structuredudquestionnaires distributed to contractors of construction project sites in Lagos State and Qualitative data was obtained fromudinterview of key management personnel of the companies and journals. Ranking analysis of the 33 major causes of delaysudidentified through literature review using Relative Importance Index (RII) showed that cash flow problems during constructionud(RII=4.81), clients’ financial difficulties (RII=4.47) and poor procurement (RII=4.40) were the most importantt causes of delaysudin construction project sites in Lagos State, Cost overrun (RII=4.92), late payment (RII=4.59) and project extension (RII=4.45)udwere predominant effects of delay in construction project. Hypotheses testing on relationship between shortage of skilledudlabour, improper equipment during construction and delay in construction project using One-Way ANOVA showed positiveudcorrelation. For improved efficiency and effective project delivery in the industry, proper payment from client (RII=4.78),udcompetent project managers (RII=4.64), the use of
机译:延误是全世界建筑业面临的普遍问题,尤其是在发展中国家。本研究的目的是从“承包商”的角度评估导致延误的因素及其对尼日利亚拉各斯大城市的建设项目的影响。它是基于承包商在建筑项目中不断出现的延误。本研究采用目的过采样方法。通过分配给拉各斯州建设项目工地承包商的一百(100)个结构化问卷调查获得定量数据,而从公司和期刊的主要管理人员访谈中获得定量数据。通过相对重要性指数(RII)通过文献综述确定的33个导致延误的主要原因的排名分析显示,施工期间的现金流问题(RII = 4.81),客户的财务困难(RII = 4.47)和不良的采购(RII) = 4.40)是拉各斯州建设项目工地延误最重要的原因成本超支(RII = 4.92),逾期付款(RII = 4.59)和项目延期(RII = 4.45) udder是施工延误的主要影响因素项目。使用单向方差分析对技术熟练,劳动力短缺,施工期间设备不当与建设项目延迟之间的关系进行的假设检验显示为正不相关。为了提高行业效率和有效的项目交付,请从客户(RII = 4.78),胜任的项目经理(RII = 4.64)适当付款,使用

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号