An Innovative Time-Cost-Quality Tradeoff Modeling of Building Construction Project Based on Resource Allocation

机译:基于资源分配的建筑工程项目时间成本质量权衡模型

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The time, quality, and cost are three important but contradictive objectives in a building construction project. It is a tough challenge for project managers to optimize them since they are different parameters. This paper presents a time-cost-quality optimization model that enables managers to optimize multiobjectives. The model is from the project breakdown structure method where task resources in a construction project are divided into a series of activities and further into construction labors, materials, equipment, and administration. The resources utilized in a construction activity would eventually determine its construction time, cost, and quality, and a complex time-cost-quality trade-off model is finally generated based on correlations between construction activities. A genetic algorithm tool is applied in the model to solve the comprehensive nonlinear time-cost-quality problems. Building of a three-storey house is an example to illustrate the implementation of the model, demonstrate its advantages in optimizing trade-off of construction time, cost, and quality, and help make a winning decision in construction practices. The computational time-cost-quality curves in visual graphics from the case study prove traditional cost-time assumptions reasonable and also prove this time-cost-quality trade-off model sophisticated.
机译:时间,质量和成本是建筑工程中三个重要但矛盾的目标。对于项目经理来说,优化它们是一项艰巨的挑战,因为它们是不同的参数。本文提出了一种时间成本质量优化模型,该模型使管理人员能够优化多目标。该模型来自项目分解结构方法,该方法将建设项目中的任务资源划分为一系列活动,然后进一步划分为建筑劳力,材料,设备和管理。建筑活动中使用的资源最终将确定其建筑时间,成本和质量,并且最终根据建筑活动之间的相关性生成复杂的时间-成本-质量权衡模型。在模型中使用遗传算法工具解决了综合的非线性时间-成本-质量问题。以三层房屋的建造为例来说明该模型的实现,展示其在优化建造时间,成本和质量的权衡方面的优势,并有助于在建造实践中做出成功的决策。案例研究中视觉图形中的计算时间-成本-质量曲线证明了传统的成本-时间假设是合理的,并且还证明了这种时间-成本-质量权衡模型的复杂性。

著录项

  • 期刊名称 other
  • 作者

    Wenfa Hu; Xinhua He;

  • 作者单位
  • 年(卷),期 -1(2014),-1
  • 年度 -1
  • 页码 673248
  • 总页数 10
  • 原文格式 PDF
  • 正文语种
  • 中图分类
  • 关键词

  • 入库时间 2022-08-21 11:19:45

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号