首页> 外文会议>Asset Management Conference >Collaboratively Developing an Asset Management System in Highways England Area 9
【24h】

Collaboratively Developing an Asset Management System in Highways England Area 9

机译:协同开发高速公路英格兰地区的资产管理系统9

获取原文

摘要

In addition we will consider the three different perspectives: Perspective 1 YOUR 'SHOES', look at the situation from the implementer's position (your role) and ask, what do I want, what is important to me from this change? Perspective 2 END USER 'SHOES', the implementer puts themselves in the shoes of the people affected by the change. Not just to think what it is like to be in their shoes but actually to experience the situation as the people undergoing the change. Perspective 3 BUSINESS 'SHOES', stand back and experience the situation as a detached observer, as a fly on a wall looking down on the activities to relate them to the business as a whole.
机译:另外我们会考虑三种不同的观点:观点1你的“鞋子”,看看从实施者的立场(你的角色)和问,我想要什么,从这种变化到我很重要?透视2最终用户的鞋子,实施者把自己放在受改变的人民的鞋子里。不仅要思考它在鞋子里,但实际上是经历变革的人的情况。透视3商业“鞋子”,支撑并经历局面作为独立的观察者,作为墙上的飞行,俯瞰活动,将它们与整个业务联系起来。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号