首页> 外文会议>2011 International Conference on Electric Technology and Civil Engineering >Cemented mortar consolidation deformation of shield tail void grouting, part I: Consolidation model construction
【24h】

Cemented mortar consolidation deformation of shield tail void grouting, part I: Consolidation model construction

机译:盾构尾孔注浆胶结砂浆固结变形,第一部分:固结模型构建

获取原文
获取外文期刊封面目录资料

摘要

Tail void grouting is a key technology of shield tunneling to control stratum settlement. Consolidation deformation process of cemented mortar is determined by cement hydration. Based on experimental results of the influence of cementation on stress-strain relationship and permeability coefficient, the quantitative relations were established. Finally, the consolidation deformation model were derived, it can be used to truly describe the deformation of cemented mortar in tail void.
机译:尾空灌浆是盾构施工控制地层沉降的关键技术。水泥砂浆的固结变形过程由水泥水化确定。根据胶结作用对应力-应变关系和渗透系数影响的实验结果,建立了定量关系。最后,推导了固结变形模型,该模型可以真实地描述尾砂中胶结砂浆的变形。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号