首页> 外文会议>Canadian Society for Civil Engineering annual conference >REHABILITATION OF THREE BRIDGES AT LANSDOWNE AVENUE
【24h】

REHABILITATION OF THREE BRIDGES AT LANSDOWNE AVENUE

机译:Lansdowne Avenue的三座桥梁康复

获取原文

摘要

In response to challenges created by Toronto's continued growth and increased transit needs, Amec Foster Wheeler's is committed to providing resilient solutions for replacing and rehabilitating Toronto's aging transit infrastructure. Amec Foster Wheeler incorporated these principles of sustainable design when they were retained by Metrolinx to complete the detailed design and construction supervision of the rehabilitation of three bridges carrying Metrolinx tracks over Lansdowne Avenue at Mile 3.12 Weston and Newmarket Subdivisions in Toronto, Ontario. A major component of the project is the replacement of two through plate girder spans carrying three tracks with three steel beam bridge spans seated on existing abutments. The proposed infrastructure for this location in the Metrolinx Georgetown Rail Corridor will include an eight-track corridor. Five new steel beam bridge spans were previously constructed at this location and are currently carrying five tracks with the remaining two TPG spans were replaced with the proposed three steel beam span bridges in April 2016. Each of the proposed new three bridge spans consist of four built-up steel plate I beams, 20.6 m single span and 4.24 m wide ballasted steel deck carrying one track. The spans are heavily skewed at 33.6o and will be seated on existing abutments. In order to compensate for the skewed span configuration, approach slabs were designed to be installed on the existing abutment ballast walls. The project also includes raising the existing track profiles to match the profile of adjacent tracks, utility relocations, and substructure concrete repairs. The constant and consistent rail traffic significantly limited the construction window to permit span replacements through available track blocks over two weekends only. In response to this challenge and to minimize the amount of work to be completed in the two weekend blocks, Amec Foster Wheeler's engineers devised that the bridge spans to be pre-assembled adjacent to the site and they were installed in one piece during the track blocks. Additionally, the existing ballast walls were modified by installing precast concrete sections complete with a seat for the new precast approach slabs. Further, the new bearings on steel grillage bearing seat assemblies were installed in order to raise the new beam spans and maintain the existing road clearance, with existing utilities relocated in advance of the proposed track blocks. Also, the existing bearing seats were leveled using a fast curing non-shrink, non-corrosive, non-metallic cementitious grout (Dayton Superior, Turbo Grout LT12). By utilizing these innovations Amec Foster Wheeler achieved the goal of rehabilitating this critical infrastructure asset, while at the same time ensuring minimal disruption to the essential rail traffic.
机译:为了应对多伦多持续增长和增加的运输需求所产生的挑战,Amec Foster Wheeler致力于为更换和恢复多伦多的老化过境基础设施提供弹性解决方案。 Amec Foster Wheeler在Metrolinx保留了这些原则,在Metrolinx保留,完成了在阿尔塔约省的Mile 3.12 Weston和Newarket细分的兰斯Downe Avenue over Lansdowne Avenue的三座桥梁康复的详细设计和施工监督。该项目的一个主要组成部分是替换载有三条轨道的两个通过坐在现有基台上的三个钢梁横跨轨道的轨道跨度。在Metrolinx Georgetown轨道走廊中,该地点的建议基础设施将包括八轨走廊。此前在这个位置构建了五个新的钢梁横跨跨度,目前正在携带五条轨道,其余两种TPG跨度被提出的三个钢梁跨度桥在2016年4月取代。每个提出的新三桥跨度都包括四个建造-UP钢板I梁,20.6米单跨和4.24米宽的钢板携带一条轨道。斯普斯在33.6o串行倾斜,并将坐在现有的基台上。为了补偿偏斜跨度配置,设计平板被设计成安装在现有的邻接镇流器墙上。该项目还包括培养现有的轨道配置文件以匹配相邻轨道,公用事业重新定位和子结构混凝土修理的配置文件。恒定和一致的轨道交通显着限制了建筑窗口,以便仅通过可用的轨道块仅在两个周末通过可用的轨道块替换。为了响应这一挑战并最大限度地减少在两个周末块中完成的工作量,AMEC培养驾驶员的工程师设计了桥梁跨越地点预装配,并且在轨道块期间安装在一件上。此外,通过安装预定的座椅的预制混凝土部分来修改现有的镇流器墙,以用于新的预制方法板坯。此外,安装了钢毛坯轴承座椅组件上的新轴承,以提高新的光束跨度并保持现有的道路间隙,并在所提出的轨道块之前搬迁现有的公用事业。此外,现有的轴承座采用快速固化的非收缩,非腐蚀性,非金属胶凝浆(Dayton Superient,Turbo Grout LT12)水平。通过利用这些创新,AMEC促进驾驶员实现了恢复这一关键基础设施资产的目标,同时确保对基本铁路交通的严重破坏。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号