Schedule Trend Control Charts in Excel

机译:在Excel中计划趋势控制图

获取原文

摘要

A schedule analyst's job goes beyond the basics of updating schedules and providing Gantt charts with critical paths. He/she should provide project management and teams with insight into the health of the project through trend analysis, and assist in identifying any specific activities that may negatively impact the project. Often, standard schedule reporting features are limited and not user-friendly. In many cases, activity trend analysis and schedule quality metrics are not provided, but must be purchased for specific schedule platforms and versions. The schedule trend control charts presented in this paper are intended to remedy this situation and include: Trend of Total Float, an S-curve based on finish date and milestone trends and associated analytical techniques that can be used across platforms. They were developed by copying and pasting schedule data into a Microsoft Excel workbook and are primarily designed for the schedule analyst, but can be presented to management.
机译:计划分析员的工作超出了更新计划和为甘特图提供关键路径的基础。他/她应通过趋势分析为项目管理和团队提供对项目运行状况的洞察力,并协助确定可能对项目产生负面影响的任何特定活动。通常,标准进度报告功能有限且不友好。在许多情况下,没有提供活动趋势分析和计划质量指标,但必须为特定的计划平台和版本购买。本文中提出的进度趋势控制图旨在纠正这种情况,包括:总浮动趋势,基于完成日期和里程碑趋势的S曲线以及可在各个平台上使用的相关分析技术。它们是通过将计划数据复制并粘贴到Microsoft Excel工作簿中而开发的,并且主要是为计划分析人员设计的,但可以呈现给管理层。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号