首页> 外文期刊>Operations Research >Interactive Excel-based Gantt chart schedule builder
【24h】

Interactive Excel-based Gantt chart schedule builder

机译:基于交互式Excel的甘特图计划生成器

获取原文
获取原文并翻译 | 示例
           

摘要

Purpose: To present an Excel-based Gantt chart schedule builder that enables students to experiment with building schedules for single and parallel machine problems. Summary: The earliest due date rule is optimal for the scheduling problem for one machine with the objective of minimizing maximum lateness. However, not all scheduling dispatching rules have good approximation guarantees. In order to enable the process of trial and error experimentation, the article developed an Excel-based interactive Gantt chart schedule builder which complements traditional scheduling. The schedule builder first allows a user to input a specific scheduling problem example with a set number of machines, jobs, parameter values (e.g., processing times, due dates), and constraints (e.g., precedence, preemptions). Then the user can build a schedule and click a button to measure the quality of that schedule using objective functions consistent with the classic scheduling book. After seeing the quality of the schedule, the user can interactively adjust which jobs are assigned to which machines and the corresponding sequences. Further the schedule builder has additional functionality such as building algorithmically a schedule based on a selected scheduling rule. The schedule builder was tested in a Summer of 2014 in a three-credit course first homework assignment, where the students were asked four similar questions and the students were encouraged to use the builder and a preliminary assessment of the tool based on the student perception metric was performed. (23 refs.)
机译:目的:展示一个基于Excel的甘特图进度表生成器,使学生能够试验单机和并行机问题的生成进度表。简介:最早的到期日期规则最适合一台机器的调度问题,目的是最大程度地减少最大延迟。但是,并非所有的调度调度规则都具有良好的近似保证。为了支持反复试验的过程,本文开发了一种基于Excel的交互式甘特图计划生成器,该生成器可以补充传统的计划。计划生成器首先允许用户输入特定数量的计划问题示例,其中包含设置数量的机器,作业,参数值(例如,处理时间,到期日)和约束(例如,优先级,优先级)。然后,用户可以建立时间表,并单击按钮以使用与经典时间表手册一致的目标功能来测量该时间表的质量。在看到调度的质量之后,用户可以交互地调整将哪些作业分配给哪些机器以及相应的顺序。进度表生成器还具有其他功能,例如基于选定的调度规则在算法上构建进度表。进度表构建器于2014年夏季在三学分的课程首次作业中进行了测试,向学生询问了四个类似的问题,并鼓励学生使用构建器并根据学生的感知指标对工具进行初步评估被执行了。 (23篇)

著录项

  • 来源
    《Operations Research》 |2017年第6期|461-462|共2页
  • 作者单位

    Industrial Engineering, University of Arkansas, Fayetteville, AK 72701;

    Operational Sciences, Air Force Institute of Technology, WPAFB, OH 45433;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号