首页> 外文会议>International Colloquium on Transformer Research and Asset Management >Power Transformer Efficiency-Survey Results and Assessment of Efficiency Implementation
【24h】

Power Transformer Efficiency-Survey Results and Assessment of Efficiency Implementation

机译:电力变压器效率调查结果及效率评估

获取原文

摘要

Cigre working group A2.56 Power Transformer Efficiency conducted a survey among utilities worldwide to determine how maximum allowed losses are managed in their existing specifications of transformers-whether the losses are capitalized and how the load and no load, loss factors are calculated etc. Findings of that survey will be presented in the paper.
机译:Cigre A2.56电力变压器效率工作组在全球公用事业公司中进行了一项调查,以确定如何在其现有变压器规格中管理最大允许损耗-是否将损耗资本化以及如何计算负载和空载,损耗因子等。该调查的结果将在论文中介绍。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号