DEVELOPMENT A NEW CONCEPT IS CALLED KNOWLEDGE BREAKDOWN STRUCTURE (KBS)

机译:发展一个新的概念被称为知识分解结构(KBS)

获取原文

摘要

Execution of a project requires all the tasks and activities to be embedded in order to assist the planner in project implementation. For a large project to be properly planned and executed, it must be compartmentalized into small segments in a structural manner. The planning and execution of these segments is then assigned to specific organizational units. This approach, called the work-breakdown structure (WBS) (Globerson, 1994). Resource allocation relates directly to the topic of scheduling because altering schedules can alter the need for resources and alter the timing of resources needs. The scheduling is typically based on the previously determined work breakdown structure (WBS) (Meredith and Mantel, 2003), distribution the resources on work breakdown structure will appear another structure called resource breakdown structure (RBS). Determination of a budget requires resources allocating over schedule of a project; cost estimator assigns expenditures of the project for each activity, collecting all expenditures reflects budgets of the project, distribution the cost through the schedule of WBS called cost breakdown structure (CBS). This research will develop a new concept is called knowledge breakdown structure (KBS), the methodology looks like methodologies of WBS, RBS, and CBS, but filling the segments will be bottom - up alone. It is beneficial for knowledge management subject, knowledge breakdown structure will assist an organisation to reuse the knowledge which they got from previous projects, once the organisation reuses it, they will pass the previous mistake.
机译:项目执行需要嵌入所有任务和活动,以协助计划员在项目实施中。对于妥善计划和执行的大型项目,必须以结构方式分别为小部分。然后将这些段的规划和执行分配给特定的组织单位。这种方法称为工作 - 击穿结构(WBS)(Globerson,1994)。资源分配直接与调度主题相关,因为更改计划可以改变资源的需要,并更改资源需求的时间。调度通常基于先前确定的工作崩溃结构(WBS)(Meredith和Meredith和Mantel,2003),分布工作崩溃结构上的资源将显示另一个称为资源崩溃结构(RB)的结构。确定预算需要资源分配项目的时间表;成本估算者为每项活动分配项目的支出,收集所有支出反映了项目的预算,通过称为成本崩溃结构的WBS的时间表分配成本(CBS)。该研究将开发一个新的概念被称为知识击穿结构(KBS),该方法看起来像WBS,RB和CBS的方法,但填充段将单独底部。它有利于知识管理主题,知识分解结构将协助组织重用他们从以前的项目中获得的知识,一旦组织重新使用它,他们将通过之前的错误。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号