首页> 外文会议>International conference on transportation engineering;ICTE 2009 >Analysis and Capacity Expansion Revamping Of Passenger-Cargo Transportation in the Chengdu-Kunming Railway
【24h】

Analysis and Capacity Expansion Revamping Of Passenger-Cargo Transportation in the Chengdu-Kunming Railway

机译:成昆铁路客货运输量分析及扩能改造

获取原文

摘要

The Chengkun depot in the Chengdu-Kunming railway has some problems because of poor transportation capacity, such as low traveling speed of passenger-cargo train, bad transportation organization elasticity, limited passenger transportation, insufficient cargo transportation capacity. After predicting and analyzing the future demand of passenger-cargo transportation, a conclusion has been drawn that the transportation capacity of the Chengdu-Kunming Railway Line has already been far from meeting the economic development along the line's demands at present, and must expand transformation capacity. More different revamping measures was compared, and some of those measures are accelerating to built strategy loading point and expand the capacity of the existing lines so as to alleviate the pressure of transportation capacity, but building the second line (or double track) is the basic scheme of solving the capacity problem.
机译:成昆铁路成昆段运输能力差,旅客列车运行速度慢,运输组织弹性差,旅客运输受限,货物运输能力不足等问题。在对客运的未来需求进行预测和分析后,得出的结论是,成昆铁路目前的运输能力已经远远不能满足沿线需求的经济发展,必须扩大改造能力。比较了更多不同的改造措施,其中一些措施正在加速以建立战略装载点并扩大现有线路的容量,以减轻运输能力的压力,但是建设第二条线路(或双轨)是基础解决容量问题的方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号