Project Time Management and Schedule Performance in Mexican Construction Projects

机译:墨西哥建设项目的项目时间管理和日程表绩效

获取原文

摘要

Delays are frequently reported as the cause of several conflicts that affect the different parties involved in construction projects. In order to avoid these conflicts and succeed on the delivery of construction projects, contractors should implement project management processes. Project management includes a number of planning and controlling processes that are recommended for complying with the owners' requirements related to project time, cost, quality, and others. The study reported in this paper aimed at assessing the use of processes related to Project Time Management and its relation with project schedule performance (i.e., timely completion). The study included the assessment of fourteen school construction projects executed by a public agency in the Yucatan Peninsula, Mexico. These projects were monitored during the construction phase in order to measure two different variables: the degree of use of processes related to Project Time Management and the project performance regarding timely completion. The results demonstrated there is statistical dependence between these two variables. In this case, it was found the projects that attained timely completion were also those in which most of the recommended planning and controlling processes had been implemented.
机译:延迟经常被报告为几种影响建筑项目中涉及的不同方面的若干冲突的原因。为了避免这些冲突并成功地交付建设项目,承包商应该实施项目管理流程。项目管理包括许多规划和控制进程,建议遵守与项目时间,成本,质量和其他相关的业主的要求。本研究报告了本文报告,旨在评估使用与项目时间管理有关的流程及其与项目进度绩效的关系(即及时完成)。该研究包括评估由墨西哥尤卡坦半岛的公共机构执行的十四学校建设项目。这些项目在施工阶段监测,以测量两个不同的变量:与项目时间管理相关的流程的使用程度和关于及时完成的​​项目表现。结果证明这两个变量之间存在统计依赖性。在这种情况下,有人发现,及时完成的​​项目也是那些已经实施了大多数建议的规划和控制流程的项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号