首页> 外文会议>TAPPI international environmental conference >PSD PErmitting of Saw Mill Expansion
【24h】

PSD PErmitting of Saw Mill Expansion

机译:PSD允许锯轧机扩张

获取原文

摘要

Alabama Department of Environmental Management regulations at 335-3-14 and Federal Prevention of Significant Deterioratin regulations at 40 CFR 51.165 require air permitting for modifications to exising major sources whihc would result in a significant, or 40 tons per year increase, in volatile organic compund emissions. This paper reviews the PSD permitting for the replacement of an existing sawmill with a new 4-1.000 cubic meters per year mill. The project included new debarkers, saws, planer, hog, sawdust handling system, particulate conttol systems, and support systems. the project also included repermitting three existing steam heater lumber dry kilns. The paper provides an analysis of the emission factors used in the permitting and the results of the required Best Available control Technology analysis. All approvals have bee nobtained and the project is currently under construction.
机译:阿拉巴马州环境管理部门的环境管理条例335-3-14和联邦预防40 CFR 511.165的重大脱水素法规要求空气允许对出现的主要来源进行修改,当挥发性有机多昌(每年40吨)都会导致挥发性有机多昌排放。本文审查了允许替代现有锯木厂,每年新增4-1.000立方米的磨坊。该项目包括新的脱杆,锯,刨床,猪,锯末处理系统,微粒轮廓系统和支持系统。该项目还包括重新施加三个现有的蒸汽加热器木材干燥窑。本文提供了在允许的释放因子和所需最佳可用控制技术分析的结果的分析。所有批准都有蜜蜂NOMTOMET,该项目目前正在建设中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号