首页> 外文会议>Ground engineering in a changing world >Case Studies of Geotechnical Risk Management of Construction Near a Live Railway
【24h】

Case Studies of Geotechnical Risk Management of Construction Near a Live Railway

机译:铁路附近施工的岩土工程风险管理案例研究

获取原文
获取原文并翻译 | 示例

摘要

Construction near a live railway involves geotechnical risks that must be managed to ensure safernoperations, within a very limited timeframe. Three successful case histories are presented. CasernStudy 1 presents the study of a temporary retaining wall to install a bridge pile foundation. Case Studyrn2 presents the study of demolishing an existing road bridge over a railway. It discusses in detailrnprotecting the existing retaining wall. Case Study 3 presents the study of a drainage pipe installationrnunderneath the railway. The geotechnical and construction uncertainties are discussed andrnhighlighted in the case histories.
机译:现场铁路附近的建设涉及岩土工程风险,必须在非常有限的时间内对其进行管理以确保安全运行。介绍了三个成功的案例历史。 CasernStudy 1提出了对安装桥桩基础的临时挡土墙的研究。案例研究2提出了拆除铁路上现有公路桥梁的研究。它详细讨论了如何保护现有的挡土墙。案例研究3提出了对铁路下方的排水管安装的研究。在案例历史中讨论并突出了岩土工程和施工中的不确定性。

著录项

  • 来源
  • 会议地点 Melbourne(AU)
  • 作者

    W. Li; A. Bulcock; E. Lo;

  • 作者单位

    Parsons Brinckerhoff Australia, Level 4, Northbank Plaza, 69 Ann Street, Brisbane QLD, Australia, PH (61) 7 3854 6200, FAX (61) 7 3831 4223, email: wli@pb.com.au;

    Parsons Brinckerhoff Australia, Level 4, Northbank Plaza, 69 Ann Street, Brisbane QLD, Australia, PH (61) 7 3854 6200, FAX (61) 7 3831 4223, email: abulcock@pb.com.au;

    Parsons Brinckerhoff Australia, Level 4, Northbank Plaza, 69 Ann Street, Brisbane QLD, Australia, PH (61) 7 3854 6200, FAX (61) 7 3831 4223, email: elo@pb.com.au;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    case study; geotechnical risk management; live railway;

    机译:案例研究;岩土工程风险管理;现场铁路;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号