Optimization support system for hydraulic power plant construction plan, optimization support system for construction work of hydro power plant, and optimization support method for hydraulic power plant construction plan

机译:水电站建设方案优化支持系统、水电站建设工程优化支持系统、水力电厂建设方案优化支持方法

摘要

To support the setting of a construction plan in a hydraulic power plant so as to enhance power generation efficiency.SOLUTION: A hydraulic power plant construction plan optimization support server (10) includes a construction plan input part (11) for receiving an input a desired construction plan including a desired construction period, a stop facility determination part (12) for determining a power generation facility requiring stop of power generation in the case of stopping an apparatus to be an object of the desired construction plan subjected to input reception, a water overflow amount calculation part (13) for calculating a water overflow amount due to the stop of the power generation facility on the basis of an actual water amount result related to the power generation facility determined to require stopping in the case where there is the power generation facility determined to require stopping, a proposal part (14) for proposing to change the desired construction period to an other construction period on the basis of the calculated water overflow amount, a construction plan determination part (15) for receiving an input to determine change of a construction period corresponding to the proposed other construction period to determine the construction plan, and a construction plan output part (16) for outputting the construction plan.SELECTED DRAWING: Figure 2
机译:支持制定水力发电厂的建设计划,以提高发电效率。解决方案:水力发电厂建设计划优化支持服务器(10)包括用于接收所需施工计划输入的施工计划输入部分(11),用于接收包括所需施工期在内的所需施工计划的输入,用于确定在停止设备作为所需施工计划对象的受输入接收的情况下需要停止发电的发电设施, 溢水量计算部分(13)用于计算发电设施停工导致的溢水量,该水量是根据与发电设施相关的实际水量结果确定需要停工的,在有发电设施确定需要停工的情况下,建议第(14)部分建议将预期施工期改为其他施工期在计算出的溢水量中,施工图确定部分(15)用于接收输入,以确定与拟议的其他施工期相对应的施工期的变化,以确定施工图则,以及用于输出施工图则的施工图输出部分(16)。所选图纸:图 2

著录项

  • 公开/公告号JP7412673B2;JP2024007412673B2;JP7412673B2;JP7412673B

    专利类型

  • 公开/公告日2024-01-15

    原文格式PDF

  • 申请/专利号JP2019160601;JP201900000160601;JP2019160601A;JP20190160601

  • 发明设计人

    申请日2019-09-03

  • 分类号G06Q50/06;

  • 国家

  • 入库时间 2024-06-15 00:09:34

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号