In an apparatus and a method for calibrating and for straightening pipe pieces (5) is one with calibration jaws (3) provided Kalibriereinhe i t (1). to which on rockers pivotal and movable in the horizontal plane, the conveying rollers (30) are connected on both sides in the vertical plane. in the calibration unit upon insertion of the feed motion to the section-wise feeding a piece of pipe (5) (1) is blocked while the vertical movement of the rockers (38) until the calibration jaws (3) touching in their closing movement to be calibrated pipe section almost. The latest with the contact of the pipe section by the jaws (3) the blocking of the rocker motion is canceled, and the acceleration in the calibration phase of the closing movement of the jaws (3) is reduced. After completion of the calibration process before the calibration jaws (3) are opened again, the seesaw movement of the rollers (30) is blocked again. To influence the movement of the rocker are brakes (44) provided, which are tightened upon insertion of the feed movement of the conveyor rollers (30). They are with the aid of sensors (26) are coupled to the calibration jaws (3). detachably, in addition, the sensor (26) are the same with the driving of the calibration jaws for opening and closing in operative connection.
展开▼
机译:在用于校准和矫直管件(5)的设备和方法中,有一个带有卡爪(3)的管,该卡爪为Kalibriereinhe i Sup> t(1)。在摇臂上可在水平面内枢转和移动的输送辊(30)在垂直平面的两侧均与之连接。插入分段运动的进给运动后,校准单元中的一根管子(5)(1)被阻塞,同时摇杆(38)的垂直运动直到校准钳口(3)闭合时接触到几乎要校准管道截面。通过卡爪(3)与管段的接触,最后消除了摇杆运动的阻碍,并且降低了卡爪(3)的闭合运动在校准阶段的加速度。在完成校准过程之后,在再次打开校准爪(3)之前,再次阻止了滚轮(30)的跷跷板运动。为了影响摇杆的运动,设置了制动器(44),该制动器在插入输送辊(30)的进给运动时被紧固。它们借助于传感器(26)耦合到校准钳(3)。此外,可拆卸地,传感器(26)与用于在操作性连接中打开和关闭的校准爪的驱动相同。
展开▼