首页> 外国专利> Prefabricated concrete tunnel component - comprises top and bottom half-frames with anchor bolts for assembly on site

Prefabricated concrete tunnel component - comprises top and bottom half-frames with anchor bolts for assembly on site

机译:预制混凝土隧道组件-包括顶部和底部半框架以及锚固螺栓,可在现场进行组装

摘要

The prefabricated reinforced-concrete component is for use in mines or road tunnels and comprises a first half-frame (100) and a second top one (101). These have sockets or anchor bolts (103), so that they can be assembled together on site using using two rope slings. For transport, they can be nested together on a low-loading trailer (104), to keep the overall height within the limites of the authorised loading gauge (108). The joints between them can be injected with cement. (Incorrect patentee name week 8338, Reissued week 8903).
机译:预制的钢筋混凝土构件用于矿井或公路隧道,并且包括第一半框架(100)和第二顶部框架(101)。它们带有承窝或地脚螺栓(103),因此可以使用两个绳索吊索将它们现场组装在一起。为了运输,它们可以一起嵌套在低负荷的拖车(104)上,以使总高度保持在授权的负荷计(108)的范围内。它们之间的接合处可以注入水泥。 (错误的专利权人名称第8338周,重新发布的第8903周)。

著录项

  • 公开/公告号BE896080A4

    专利类型

  • 公开/公告日1983-09-05

    原文格式PDF

  • 申请/专利权人

    申请/专利号BE19830896080

  • 发明设计人

    申请日1983-03-04

  • 分类号E21D;E01C;

  • 国家 BE

  • 入库时间 2022-08-22 11:18:46

相似文献

  • 专利
  • 外文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号