首页> 外国专利> METHOD AND APPARATUS FOR PLACING CONCRETE IN DAM CONSTRUCTION WORK

METHOD AND APPARATUS FOR PLACING CONCRETE IN DAM CONSTRUCTION WORK

机译:大坝工程中混凝土浇筑的方法和装置

摘要

PURPOSE:To permit the continuous placement of concrete by a method in which concrete is supplied to tripper conveyer for continuous placement and the height of the frame of the tripper conveyer is increased by matching the progress of concrete placement. CONSTITUTION:Concrete supplied from a batcher plant is sent through a charging conveyer and an inclined conveyer 8 to a tripper conveyer 1. The concrete from the tripper conveyer 1 is transferred to a tripper 4 and then charged through an expansible chute 6 and a portable conveyer 7 onto a placement site. As the concrete placement proceeds and the placed level of concrete comes near the frame 3 of the tripper conveyer 1, an extending member is connected to a support 2 by lifting the frame 3 and the height of the tripper conveyer 1 is altered. At the same time, the hight of the head of the inclined conveyer 8 is also altered. The hightening work of the tripper conveyer 1 is preferably made alternately by providing left- and right-handed tripper conveyers 1 and 1'.
机译:目的:为了允许通过将混凝土供应到卸料机输送机进行连续放置的方法来连续放置混凝土,并且通过匹配混凝土的放置进度来增加卸料机输送机的框架的高度。组成:从配料厂供应的混凝土通过装料输送机和倾斜输送机8输送到卸料机输送机1。将卸料机输送机1的混凝土转移到卸料机4,然后通过可膨胀斜槽6和便携式输送机进行装料。 7放置到放置位置上。随着混凝土放置的进行以及所放置的混凝土液位接近卸料器输送机1的框架3,通过抬高框架3将延伸构件连接到支撑件2,并且卸料器输送机1的高度改变。同时,倾斜输送机8的头部的高度也被改变。卸料器输送机1的提升工作优选地通过设置左手和右手的卸料器输送机1和1'来交替进行。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号