首页> 美国卫生研究院文献>Materials >Construction of Roller Compacted Concrete Dams in Hot Arid Regions
【2h】

Construction of Roller Compacted Concrete Dams in Hot Arid Regions

机译:干旱地区碾压混凝土坝的建设

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Roller compacted concrete (RCC) dams are attractive to many water and energy corporations around the world due to their ease in construction and low construction cost. The hydration of cement and the climatic changes on the convective boundaries are the two main heat sources for the temperature rise in the roller compacted concrete dams. Thus, changing the RCC placement schedule according to climate conditions might eliminate the problem of thermal cracks. In this research, the RCC dam method was applied in an arid region; the Bisha state in Saudi Arabia was chosen as a case study. We found that RCC dam technology can be applied safely with an alternative solution, like selecting a suitable placement schedule and reducing the placing temperature of facing at upstream and downstream sides to overcome the risk of thermal cracks.
机译:碾压混凝土(RCC)大坝由于易于施工且成本低廉,因此吸引了世界各地的许多水和能源公司。水泥的水化和对流边界的气候变化是碾压混凝土坝温度升高的两个主要热源。因此,根据气候条件更改RCC放置时间表可以消除热裂纹问题。在这项研究中,RCC坝法被应用于干旱地区。案例研究选择了沙特阿拉伯的Bisha州。我们发现,RCC大坝技术可以与其他解决方案一起安全地应用,例如选择合适的布置时间表并降低上游和下游侧面板的布置温度,以克服热裂纹的风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号