首页> 外文期刊>天津大学学报:英文版 >Fuzzy Earthwork Dynamic Allocation and Optimization for Construction of High Concrete Face Rockfill Dam
【24h】

Fuzzy Earthwork Dynamic Allocation and Optimization for Construction of High Concrete Face Rockfill Dam

机译:高面板堆石坝施工的模糊土石方动态分配与优化。

获取原文
获取原文并翻译 | 示例
       

摘要

Due to the complexity of earthwork allocation system for the construction of high concrete face rockfill dam,traditional allocation and planning are not able to function properly in the construction process with strong randomness.In this paper,the working mechanism of earthwork dynamic allocation system is analyzed comprehensively and a solution to fuzzy earthwork dynamic allocation is proposed on the basis of uncertain factors in the earthwork allocation of a hydropower project.Under the premise of actual situation and the experience of the construction site,an all-coefficient-fuzzy linear programming mathematical model with fuzzy parameters and constraints for earthwork allocation is established according to the structure unit weighted ranking criteria.In this way,the deficiency of certain allocation model can be overcome.The application results indicate that the proposed method is more rational compared with traditional earthwork allocation.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号