18.ABSTRACTA programmable electronic delay fuse for initiatinga firing after a programmed and accurate delay timehas been chosen, comprising a fire control unit(FCU), a programming unit (PU) to program and testthe fire control unit (FCU), and optical couplinginterface means on each unit to link firing andstatus means on the fire control unit (FCU) withcommand and test means on the programming unit.
展开▼