首页> 外国专利> Tunnel excavation through ground surface water - using shield and bentonite suspension to support workface and allow stepwise advance

Tunnel excavation through ground surface water - using shield and bentonite suspension to support workface and allow stepwise advance

机译:通过地表水进行隧道开挖-使用盾构和膨润土悬架支撑工作面并允许逐步推进

摘要

A pit is first excavated to the depth of the tunnel floor and a caisson is sunk into the pit. A working face shield (1) is then constructed to form the caisson end wall and is supported by hydraulic jacks (7). Soil is then excavated from the space (5) outside the shield. As the excavation proceeds this space is filled with bentonite suspension which supports the working face during the excavation. When the space has been excavated to the full depth the shield is advanced with a stepwise motion. USE - For digging tunnel through ground surface water or under a water basin.
机译:首先开挖一个坑至隧道底板的深度,然后将沉箱沉入坑中。然后构造工作面罩(1)以形成沉箱端壁,并由液压千斤顶(7)支撑。然后从防护罩外部的空间(5)中挖出土壤。随着挖掘的进行,该空间充满了膨润土悬浮液,该悬浮液在挖掘过程中支撑工作面。当空间被挖掘到最大深度时,防护罩以逐步运动的方式前进。用途-用于在地表水或水池下挖隧道。

著录项

  • 公开/公告号CH664422A5

    专利类型

  • 公开/公告日1988-02-29

    原文格式PDF

  • 申请/专利权人 MARTI HOLDING AG BERN;

    申请/专利号CH19830004542

  • 发明设计人 BALMER PAUL;CAMPANA EMIL;

    申请日1983-08-19

  • 分类号E21D10/00;

  • 国家 CH

  • 入库时间 2022-08-22 06:53:09

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号