STORAGE INSTALLATION FOR HIGH DENSITY COAL-WATER SLURRY

机译:高密度煤水泥浆的存储安装

摘要

PURPOSE:To provide a low cost and simple storage installation by constructing a pipeline, which feeds slurry from storage tanks having no mixing agitator to a homogeneously mixing tank, and another pipeline which returns the slurry from the homogeneously mixing tank to the storage tanks. CONSTITUTION:When a plurality of storage tanks 1a are filled with high density coal-water slurry(CWM), clarified water occupies the upper layer and the density and viscosity in the lower layer increase to form a soft pack. And then, CWM in the storage tanks 1a is transferred to an emulsifying tank 1b by means of pipelines 8 and a slurry pump 9a before about one day for the use of CWM. Transferred CWM is agitated by a agitator 2 to unify the density but some CWM stay behind. A part of CWM in the tank 1b is returned to the storage tank 1a through pipelines 10 by a pump 9b to eject with a high speed from jet washing nozzles 11 and to improve the fluidity of CWM staying behind for feeding to the tank 1b. On this occation, a line-mixer 12 is driven to further unify the slurry.
机译:用途:通过构建一条管道来提供低成本和简单的存储安装,该管道将没有混合搅拌器的储罐中的浆液喂入均质混合罐,而另一条管道将浆料从均质混合罐中返回到储罐中。组成:当多个储罐1a装满高密度煤水浆(CWM)时,澄清水占据上层,下层的密度和粘度增加,形成软包装。然后,在使用CWM的大约一天之前,通过管道8和浆料泵9a将储槽1a中的CWM转移至乳化槽1b。搅拌器2搅拌转移的CWM以统一密度,但有些CWM滞后。罐1b中的一部分CWM通过泵9b通过管道10返回到储罐1a,以从喷射清洗喷嘴11高速喷出,并改善留在后面的CWM的流动性,以输送到罐1b。在该时刻,驱动管线混合器12以进一步统一浆料。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号