首页> 外国专利> shi - digging Shank control law and digging Shank control control equipment null of rudo

shi - digging Shank control law and digging Shank control control equipment null of rudo

机译:shi-挖柄控制律和挖柄控制控制设备

摘要

PURPOSE:To improve simultaneous execution performance by applying jack groups which are provided in a machine body portion leaving a space in the circumferential direction to the front portion of segments and operating same, and propelling a shield excavator while executing the assembling of segment blocks. CONSTITUTION:Excavation is carried out by rotating the cutter head 2 of a shield excavator while shield jack groups 5 are applied to the front portion of assembled segments 10 and operated (extended), to control the propulsion and the propulsion direction of the shield excavator by the thrust of the jacks. During the excavation, the jack groups are controlled to be automatically inoperative (contracted) against a part of the segments 10 to execute the assembling of the segments one after another, making the synthetic thrust of the jacks a defined value while setting the direction of propulsion to control excavation. Thereby, the simultaneous execution of the shield excavation and the assembling of the segments 10 can be smoothly carried out.
机译:目的:通过将设置在机体部分中的千斤顶组应用到分段的前部并在圆周方向上留出空间并对其进行操作,并在执行分段块的组装时推动盾构挖掘机,以提高同时执行性能。组成:开挖是通过旋转盾构挖掘机的刀头2进行的,同时将盾构千斤顶组5应用于已组装的节段10的前部并进行操作(扩展),以通过以下方式控制盾构挖掘机的推进力和推进方向:千斤顶的推力。在挖掘过程中,千斤顶组被控制成自动抵御分段10的一部分而无法工作(收缩),以依次进行分段的组装,从而在设定推进方向的同时使千斤顶的合成推力为定义值控制挖掘。由此,能够顺畅地同时进行盾构的挖掘和节段10的组装。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号