PROCESS FOR THE CONSTRUCTION OF A WORK UNDER A SLOPE SUPPORT OF A RAILWAY (1) or a roadway, which consists of sectioning TEMPORARILY VIA (1) straightness TO THE POSITION UNDER THE BATTER support (2) of this pathway FOR PASSAGE TO PERFORM AND TO MAKE AN eXPLORATION (25) earthworks at the site, wherein CONSISTS OF PRODUCING OR ARRANGE PREVIOUSLY IN AT LEAST ONE SIDE OF THE eXPLORATION (25), IF NECESSARY IN EACH THE TWO SIDES OF THIS, BY BOTH PARTIES BATTER AND OPPOSITE EACH OTHER, AT LEAST ONE pitching PLANO (3) SUPPORT AND GUIDANCE FOR A hollow frame (13) of concrete, the frame (13) is carried by pitching (3) OUTSIDE THE eXPLORATION (25) PLACED, pARALLEL TO THE SIDES LATERAL FRAME SHAFT (13), at least a tripwire (20), this cable (20) is secured to one end A fixed anchor point (12, 28) while the other end is CAUGHT WITH A CAT (19) CARRIED BY MARCO (13) so that the tensile force exerted on the cable (20) by Jack (129) results, AS A RESULT OF REACTION ON emboss ANCHOR (12, 28) EFFECT OF THRUST on the frame (13) GRADUALLY SLIDING ON pitching (3) THEN ON THE FLOOR OF THE eXPLORATION (25) DIRECTLY TO ENSURE penetration THIS, IN FRONT OF pitching (3).
展开▼