首页> 外国专利> METHOD FOR BUILDING THERMAL POWER PLANT BOILER RIDGE

METHOD FOR BUILDING THERMAL POWER PLANT BOILER RIDGE

机译:火电厂锅炉桥架的建造方法

摘要

PROBLEM TO BE SOLVED: To ensure safety of an operation by assembling a top girder in parallel with an assembling step of a support structure of a boiler body, and sequentially assembling the body under the girder by following lifting up of the girder, thereby shortening an execution period and reducing a high place working. ;SOLUTION: A top girder (uppermost steel girder) 3 for hanging a boiler body is assembled out of a support structure 2 in parallel with a building work of a turbine supporting structure 1 and a boiler body supporting structure 2, and transferred into a supply space 21. Then, the girder 3 is lifted up to an upper part of the structure 2 by a jack, climbing unit and other unit installed at the part of the structure 2 and fixed. Then, the body (kiln part) is sequentially assembled from an upper part toward a lower part by hanging the girder 3. The structure 2 is built to a predetermined height in parallel with an assembling work of the body.;COPYRIGHT: (C)1998,JPO
机译:解决的问题:为了确保操作的安全性,通过与锅炉主体的支撑结构的组装步骤平行地组装顶梁,并通过提起梁来顺序地在梁下组装梁,从而缩短了操作时间。执行期,减少高处工作。 ;解决方案:用于悬挂锅炉本体的顶梁(最上层钢梁)3与涡轮机支撑结构1和锅炉本体支撑结构2的建筑工作并行地从支撑结构2组装而成,并转移到供应源中空间21。然后,通过安装在结构2的一部分上并固定的千斤顶,爬升单元和其他单元,将梁3提升到结构2的上部。然后,通过悬挂大梁3,从上部到下部顺序地组装主体(窑炉部分)。结构2在与主体的组装工作平行的情况下被构造成预定的高度。 1998年

著录项

  • 公开/公告号JPH10281403A

    专利类型

  • 公开/公告日1998-10-23

    原文格式PDF

  • 申请/专利权人 TAISEI CORP;

    申请/专利号JP19970098466

  • 申请日1997-04-01

  • 分类号F22B37/24;E04H5/02;

  • 国家 JP